The matrix behind the list is built once per equipment class, fitted to your hall, and delivered at commissioning handover with its test evidence.
An alarm list is only as good as the matrix behind it: for each alarm, its cause, its consequence, the operator's action and its priority. In a process plant, writing that matrix takes a team of operators and engineers a season of workshops. In a liquid-cooled AI hall the equipment repeats, so most of that work can be done once.
The coolant distribution unit, the manifolds and leak zones, the rack power shelves, the panels, the busway and the UPS of one hall are the same classes as the next hall's, so their failure modes, and most of their alarms, can be written once per class and fitted per hall. VARCOTT writes the matrix per equipment class and per platform generation, then fits it to your hall: your redundancy, your controls, your plant upstream, your procedures. What you receive is the matrix for every class in the hall with priorities and operator action text, the test evidence per alarm that commissioning guidance for liquid-cooled halls asks owners to require at handover, the matrix delivered in the form your building management and power monitoring integrator loads rather than as a separate tool, and the matrix kept current as racks are added, thresholds change and the record of the hall changes with them.